Wallet

Base wallet.
Self-custody in GreyWallet.

Send, receive, and manage Base in GreyWallet — with HD wallets, derivation control, and Private Vaults.

Network

Base

EVM family · ETH

Self-custody wallet for Base inside GreyWallet. Create or import an HD wallet, select this network, and manage ETH from iOS or Android.

Native symbol
ETH
Derivation family
EVM
In the app
Balances, transfers, DeFi positions, and NFT collections.

On Base

What this network covers.

[01]

Balances & transfers

Hold ETH, send, and receive on Base. Confirm the network before you share an address or sign.

[02]

Activity

Track outbound and inbound transfers for this network in Activity — status stays on-device with your wallet.

[03]

DeFi & NFTs

Positions and collections are available on Base alongside balances.

[04]

Private Vaults

Optional isolated wallets behind a private pattern — the same product feature on every supported network.

Family

EVM.Shared key space.

One EVM signing model across Ethereum, supported L2s, and Cronos. Pick the network in-app; the family stays the same.

Derivation

Set the EVM path.

During create or import, choose the EVM family, review the default path, and set account index. Defaults are recommended; customize when you are restoring a specific account.

Advanced derivation ↗
GreyWallet — EVM derivation controls

Get started

Base wallet.On iOS and Android.

Download GreyWallet, create or import, then select Base. Never share your recovery phrase or private pattern.